ESP (Electric submersible Pumps )sizing and Selection -Manual calculations , including the following subjects :

  • Well data
  •  Production data
  • Well fluid conditions
  • Power sources available
  • Possible problems
  • ESP sizing and selection for
  •  High water cut wells (90-100 % water)
  • Wells producing viscous fluids
  • Wells with multi-phase flow (High Gas Oil Ratio (GOR))
  • Wells producing by using Variable Speed Drive (VSD)
  • Field examples for above items
  •  Field quizzes for above items
  • Discussions

this course (3) weeks , (8-10) persons for petroleum & Reservoir and ESP applications engineers